-
Production time
from 15 days -
Minimum quantity
of 50 pieces -
Production capacity from
100 thousand a month
Air filter production plant
“MFT” was opened in 2023 and is equipped with
latest generation equipment
the Form Now!
Modern
design technologies
and production of filters
-
• Input control of raw materials
-
• Control over compliance with technological modes
-
• Control of finished products